I – Project Summary Information
a. Project Title: Saturday RRE classes for the
improvement of the NAT 3 and 6 MPS
b. Project Proponent:
Mr. Noel R. Dauran
Master- Teacher-I (English Coordinator)
c. Project Location: Banga Elementary School
Baya, Ragay,
Camarines Sur
d. Cooperating Agency:
Department of Education
Baya, Ragay,Camarines Sur
e. Funding Agency: Parent
Teachers Association
f.
Project Duration
: December 2009 – February 2010
II – Rationale:
Being an
English coordinator in this school, it is a challenge to make a difference- a
positive impact specially in terms of performance. The conduct of Saturday RRE
classes in the school was designed for the three levels of learners in Grade
III – The slow, average and fast
learners while two level of learner in Grade VI- average and fast learner. Now, therefore, the
proponent is hopeful that through this Saturday RRE classes a positive result
will be realized.
Based from
the 2012 NAT VI and III results the average MPS of Banga Elementary School is
70.97% which is below the planning standard of 75% by 4.13% and 69.37% which is
below planning standard of 5.63% respectively. It is the time to implement
project, Saturday RRE classes for the improvement of the NAT 3 and 6 MPS as
part of the intervention strategy to improve performance level of the pupils.
Below is the two-year result of NAT III and VI in
Banga Elem. School
Grade Level
|
NAT RESULT
|
|
2007-2008
|
2008-2009
|
|
Grade-III
|
74.75
|
69.37
|
Grade-VI
|
78.44
|
70.47
|
III – Project Objectives
1.
Improve the
Performance Level of the pupils in five learning areas: English, Mathematics,
Science, Filipino and Sibika.
2.
Promote active
participation and commitment of parents and teachers in the improvement of
pupils performance.
3.
Develop pupils’
values with determination, patience and love to study and strive to higher MPS
IV – Project Strategies
The NAT results were analysed by the
proponent and found out that there is really need to conduct
Remedial/review/enrichment classes to Grade III and Vi pupils to improve the
NAT MPS. The school children were assessed and categorized into slow, average
and fast learners.
To carry out this project the
following time table of activities must be fallowed:
Objectives
|
Activities
|
Time Frame
|
A.
Pre -
Implementation
|
1.
Conduct
conference with the teachers to inform them about the project.
2.
Prepare and
submit proposal for approval
3.
Conduct
orientation conference about the project
|
|
B.
Improve the PL
of the pupils in the NAT 2010
|
The
teacher assigned for each class of reteach/review/enrichment were conduct the
review on specific subject using their own strategy
|
|
C.
Post-
Implementation
|
Preparation
of the project proposal
|
|
V – Budget Requirements
The eleven Saturday
remedial/review/enrichment will utilized the purchased materials and other
review materials prepared by the teachers. Snacks/meals will be solicited from
stakeholders.
VI – Project Beneficiaries
The eleven Saturday remedial/review/enrichment
classes will improve the academic performance of the pupils in the five
learning areas. The review will provide opportunity to develop values like
determination, patience and love to study and strive to higher MPS.
To the teachers, the RRE classes are
activities to further improve their teaching skills and utilize the strategies
to help pupils perform better especially in taking tests. Their performance as
teacher is affected to a large extend by the NAT and other test results. The
school head likewise benefits the review classes. Though, it is depends on the
result. The high result will give high rating to the school head but the low
result affects the performance rating of the school head.
VII – Monitoring and Evaluation
The school head will monitor the
project on the scheduled dates of the remedial/review/enrichment classes.
Actual observation, teacher record and test results will looked into.
Prepared by:
NOEL R. DAURAN
(English Coordinator)
Recommending Approval:
______________________
Principal- I
Approved:
__________________________
Public School District Supervisor